Trail Improvements are being made from :

Corbyville to Stirling, Stirling to Hastings, Marmora to Bancroft to Lake St. Peter, Coe Hill area trail , Tweed to Sharbot Lake,

Tweed to Havelock, Trail of Two Lakes (Madoc), Kaladar, Northbrook, Denbigh.

Brushing is occuring.

Grading is being done and in low lying areas gravel is being placed.

Bridge Improvements are being completed

Signage improvements

Total completion date of the project is March 2010.

picturesofthebridgesgravelntc058_small.jpg img_0022_small.jpg img_0039_small.jpg img_0044_small.jpg
img_0047_small.jpg img_0070_small.jpg img_0073_small.jpg img_0074_small.jpg
img_0076_small.jpg img_0099_small.jpg img_0137_small.jpg img_0229_small.jpg
img_0234_small.jpg img_0236_small.jpg img_0238_small.jpg img_0241_small.jpg
img_0243_1_small.jpg img_0245_small.jpg img_0246_small.jpg img_0329_small.jpg
Page:[1] [2]

Photo album created by Barkingbird Productions